3D Modelling with Revit
The wonders of 3D Modeling!
HEC-RAS Analysis
Flooding can happen whenever flowing water surpasses its bank full stage and eventually inundate the surrounding adjacent areas. These may perhaps take place during the course of intense rainfalls and when a significant amount of snow melts. In conjunction with inundation, the increase of flow velocity may possibly erode and cause damage to fragile riverbanks...Learn More
Hospital Construction
On account of inadequate regional healthcare facility at Assab, In January 2000, the Southern Red Sea regional Eritrean Defense Force (EDF) needed to construct a referral hospital facility for the region at the outskirt city of Assab. Read More
Dam Construction
In 1997, a dam was conceived by the Ministry of Agriculture (MOA) to be built at Halhal village. The intention was to conserve water for irrigation purposes. Subsequently, the village farm can benefit directly from withdrawing water from the reservoir or from the replenished groundwater system. Read More
Surface Irrigation
In 1996, the Adigudem dam had already been completed and the next assignment was to construct the irrigation canals at the downstream of the dam. Figure 1 shows the Adigudem surface irrigation project (Gumselasa dam). Read More