LIST OF TABLES
- Table 2.1 Coefficients of Equation 2.29 (after Clark and Davies, 1988).
- Table 2.2 Base roughness coefficient values (Arcement and Schneider, 1989).
- Table 2.3 Adjustment for channel roughness values (after Arcement and Schneider, 1989).
- Table 3.1 Summary of reaches and gauging stations used.
- Table 3.2 Field observed data for assumed cross-sections.
- Table 3.3 Field survey data.
- Table 3.4 Roughness coefficient values for the reaches.
- Table 4.1 Estimation of celerity for various channel shapes (Viessman et al., 1989).
- Table 4.2 Hydraulic mean depth (after Chow, 1959 and Koegelenberg et al., 1997).
- Table 5.1 Estimated parameters for Reach-I using the M-Cal method
- Table 5.2 Estimated parameters for Reach-I using the M-Ma method.
- Table 5.3 Results for Reach-I using the M-Cal method.
- Table 5.4 Results for Reach-I using the M-Ma method.
- Table 5.5 Estimated parameters for Reach-II using the M-Cal method.
- Table 5.6 Estimated parameters for Reach-II using the M-Ma method.
- Table 5.7 Results for Reach-II using the M-Cal method.
- Table 5.8 Results for Reach-II using the M-Ma method.
- Table 5.9 Estimated parameters for Reach-III using the M-Cal method.
- Table 5.10 Estimated parameters for Reach-III using the M-Ma method.
- Table 5.11 Results for Reach-III using the M-Cal method.
- Table 5.12 Results for Reach-III using the M-Ma method.
- Table 5.13 Hydraulic parameters for Reach-I estimated using the MC-E method.
- Table 5.14 Hydraulic parameters for Reach-I estimated using the MC-X method.
- Table 5.15 Estimated parameters for Reach-I using the MC-E method.
- Table 5.16 Estimated parameters for Reach-I using the MC-X method.
- Table 5.17 Results for Reach-I using the MC-E method.
- Table 5.18 Results for Reach-I using the MC-X method.
- Table 5.19 Hydraulic parameters for Reach-II using the MC-E method.
- Table 5.20 Hydraulic parameters for Reach-II using the MC-X method.
- Table 5.21 Estimated parameters for Reach-II using the MC-E method.
- Table 5.22 Estimated parameters for Reach-II using the MC-X method.
- Table 5.23 Results for Reach-II using the MC-E method.
- Table 5.24 Results for Reach-II using the MC-X method.
- Table 5.25 Hydraulic parameters for Reach-III using the MC-E method.
- Table 5.26 Hydraulic parameters for Reach-III using the MC-X method.
- Table 5.27 Estimated parameters for Reach-III using the MC-E method.
- Table 5.28 Estimated parameters for Reach-III using the MC-X method.
- Table 5.29 Results for Reach-III using the MC-E method.
- Table 5.30 Results for Reach-III using the MC-X method.
- Table A.1 Geometrical properties of general channel shapes (Koegelenberg et al., 1997).
Revised: April 9, 2024