Warning: Cannot modify header information - headers already sent by (output started at /home/hagorbuk/public_html/wp-content/themes/megaproject-child/functions.php:8) in /home/hagorbuk/public_html/wp-content/plugins/all-in-one-seo-pack/app/Common/Meta/Robots.php on line 87

Warning: Cannot modify header information - headers already sent by (output started at /home/hagorbuk/public_html/wp-content/themes/megaproject-child/functions.php:8) in /home/hagorbuk/public_html/wp-includes/feed-rss2.php on line 8
Dam construction - Hagoscon | Water Resources Consulting https://hagoscon.com Water Resources Consulting Sun, 06 Sep 2020 10:15:14 +0000 en-US hourly 1 https://wordpress.org/?v=6.5.3 https://hagoscon.com/wp-content/uploads/2020/08/cropped-icons8-crane-48-32x32.png Dam construction - Hagoscon | Water Resources Consulting https://hagoscon.com 32 32 181703205 Dam Construction https://hagoscon.com/dam-construction/?utm_source=rss&utm_medium=rss&utm_campaign=dam-construction https://hagoscon.com/dam-construction/#respond Sun, 17 May 2020 17:26:48 +0000 https://hagoscon.com/?p=4213 In 1997, a dam was conceived by the Ministry of Agriculture (MOA) to be built at  Halhal village. The intention was to conserve water for irrigation purposes. Subsequently, the village farm can benefit directly from withdrawing water from the reservoir or from the replenished groundwater system. Read More

The post Dam Construction appeared first on Hagoscon | Water Resources Consulting.]]>
In 1997, a dam was conceived by the Ministry of Agriculture (MOA) to be built at  Halhal village. The intention was to conserve water for irrigation purposes. Subsequently, the village farm can benefit directly from withdrawing water from the reservoir or from the replenished groundwater system. Read More

The post Dam Construction appeared first on Hagoscon | Water Resources Consulting.]]>
https://hagoscon.com/dam-construction/feed/ 0 4213
Surface Irrigation https://hagoscon.com/surface-irrigation/?utm_source=rss&utm_medium=rss&utm_campaign=surface-irrigation https://hagoscon.com/surface-irrigation/#respond Mon, 17 Feb 2020 17:34:44 +0000 https://hagoscon.com/?p=4224 In 1996,  the Adigudem dam had already been completed and the next assignment was to construct the irrigation canals at the downstream of the dam. Figure  1 shows the Adigudem surface irrigation project (Gumselasa dam). Read More

The post Surface Irrigation appeared first on Hagoscon | Water Resources Consulting.]]>
In 1996,  the Adigudem dam had already been completed and the next assignment was to construct the irrigation canals at the downstream of the dam. Figure  1 shows the Adigudem surface irrigation project (Gumselasa dam). Read More

The post Surface Irrigation appeared first on Hagoscon | Water Resources Consulting.]]>
https://hagoscon.com/surface-irrigation/feed/ 0 4224